HUB Housing Cooperative

Depaving – phase 2

by xabiergranja on Jun.16, 2010, under Construction and Repairs

So, I’ve been away for a month but I’m back. When I came back last week, all the concrete from the first phase was taken out in pieces. After this, 2 days ago now, Glenn and I took all those concrete chunks and placed them in the front of the phase 2 area (you can see below in the picture), where more planting surface will be prepared eventually.

This is looking good!!


Leave a Reply

Looking for something?

Use the form below to search the site:

Still not finding what you're looking for? Drop a comment on a post or contact us so we can take care of it!